Time Spent on Engineering & Technology Mega Study
Contents
Time Spent on Engineering & Technology
Time Spent on Engineering & Technology

Related

A
Hours
A
Activities
A
Factors
A
Outcomes
A
User Variables 28
A
Measurements 1769

Tags

Engineering & Technology Usage
Time Spent on Engineering & Technology

Below is the change in Time Spent on Engineering & Technology seen after the predictor is higher than average.

Predictors
of
Below is the change in after the listed predictor is higher than average.
Sort by Effect Size
Sort by Confidence
% Change from Baseline*
*
Change from the average seen after the predictor is higher than average.

Time Spent on Engineering & Technology Info

Property Value
Variable Name Time Spent on Engineering & Technology
Aggregation Method SUM
Analysis Performed At 2020-10-11
Duration of Action 24 hours
Filling Value 0
Kurtosis 34.233282794107
Maximum Allowed Value 7 days
Mean 70 seconds
Median 15 seconds
Minimum Allowed Value 0 seconds
Number of Aggregate Predictors 0
Number of Aggregate Outcomes 26
Number of Measurements 1769
Number of Measurements (including those generated by tagged, joined, or child variables) 1376
Public true
Onset Delay 0 seconds
Standard Deviation 0.032010636206473
Unit Hours
User Variables 28
Variable Category Activities
Variable ID 6059126
Variance 0.0043316882633067